Projects - Infrastructure & Energy Buildings
![](https://yilmazlarconstructiongroup.com/image/cache/shapir liman 22-340x230.jpg)
SHAPIR HAIFA PORT
HAIFA
HAIFA PORT PROJECT IN THE CITY OF HAIFA, WITH A PIER LENGHT OF 2 KM AND A WAVE BREAKER LENGHT OF 800MT
»![](https://yilmazlarconstructiongroup.com/image/cache/Shapir Depo-340x230.jpeg)
SHAPIR WAREHOUSE
JERUSALEM 2021
CONSTRUCTION PROJECT OF RAIL SYSTEMS MAINTENANCE, REPAIR, AND STORAGE ON THE AREA OF 24.000 M2
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/tunnel531/tunel_1-340x230.jpg)
TUNNEL 531
RANANA 2014 - 2015
TUNNEL CONSTRUCTION BUILT IN 531 HIGHWAY, BUILT WITH METOD OF CUT&COVER, 200 METERS IN LENGTH.
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/intersection_bridge/intersection_1-340x230.jpg)
INTERSECTION BRIDGE 531
KFAR SHEMARYAHU 2014 - 2016
CONSTRUCTION OF TUNNEL CROSSING BUILT IN CONSOLIDATION OF NUMBER 20 HIGHWAY AND NUMBER 531 HIGHWAY, EACH 300 METERS IN LENGTH.
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/control-tower/project_115-340x230.jpg)
CONTROL TOWER BEN GRUION AIRPORT
TEL-AVIV 2013 - 2013
WATCH-TOWER IN TEL AVIV BEN GRUION AIRPORT,100MT IN HEIGHT
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/dorad-power-center/dorad-340x230.jpg)
DORAD POWER STATION
ASHKELON 2012 - 2013
PRIVATE POWER PLANT CONSTRUCTION IN ASHELON,BUILT FOR DORAD ENERGY
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/intersection-bridge/intersection_bridge_3-340x230.jpg)
INTERSECTION BRIDGE 4/20
JERUSALEM 2012 - 2013
2 BRIDGE CONSTRUCTION IN JERUSALEM,EACH BRIDGE IS 210 M IN HEIGHT.
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/eshkol-power-center/eshkol-power-340x230.jpg)
POWER STATION ESHKOL
ESHKOL 2009 - 2010
BASIC STRUCTURE FOR POWER PLANT CONSTRUCTION MADE FOR ISRAEL ELECTRIC COMPANY (CONCRETE WORK).
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/ramat-hovav-power/power-center-340x230.jpg)
POWER CENTER RAMAT HOVAV
RAMAT HOVAV 2009 - 2010
9TH UNIT CONSTRUCTION MADE FOR İSRAEL ELECTRIC COMPANY (CONSTRUCTION OF A GAS TURBIN)
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/ramla_power/ramla_power_station_1-340x230.jpg)
POWER CENTER RAMLA
RAMLA EAST TEL-AVIV 2006 - 2007
CONCRETE WORKS MANUFACTURING FOR THE INDUSTRIAL POWER PLANT THAT CONVERTS STEAM ENERGY INTO ELECTRICAL ENERGY
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/tiberiya/tiberiya-340x230.jpg)
WATER FILTRATION CENTER NETOFA VALLEY
TIBERIYA 2004 - 2006
WATER FILTRATION AND RESPITE FACILITY IN ISRAEL, 15000M3 AND CONCRETE MANUFACTURED
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/telaviv-railway/modin-telaviv-railway_2-340x230.jpg)
MODEIN - TEL-AVIV RAILWAY
MODEIN 2002 - 2005
RAILWAY VIADUCT, 410M LENGTH OF THE RAILWAY VIADUCT MADE WITH LUNCHING METHODS
»![](https://yilmazlarconstructiongroup.com/image/cache/projeler/havalani-railway/havalani_demiryolu_2-340x230.jpg)
AİRPORT RAİLWAY
TEL-AVİV AİRPORT 2003 - 2004
RAIL-ROAD BRIDGE BUILT WITH LUNCHING AND PRECAST COMPOSIT METHOD, BUILT IN THE ENTRANCE OF THE AIRPORT,650M HEIGHT IN TOTAL
»