Projects - Infrastructure & Energy Buildings
SHAPIR HAIFA PORT
HAIFA
HAIFA PORT PROJECT IN THE CITY OF HAIFA, WITH A PIER LENGHT OF 2 KM AND A WAVE BREAKER LENGHT OF 800MT
»SHAPIR WAREHOUSE
JERUSALEM 2021
CONSTRUCTION PROJECT OF RAIL SYSTEMS MAINTENANCE, REPAIR, AND STORAGE ON THE AREA OF 24.000 M2
»TUNNEL 531
RANANA 2014 - 2015
TUNNEL CONSTRUCTION BUILT IN 531 HIGHWAY, BUILT WITH METOD OF CUT&COVER, 200 METERS IN LENGTH.
»INTERSECTION BRIDGE 531
KFAR SHEMARYAHU 2014 - 2016
CONSTRUCTION OF TUNNEL CROSSING BUILT IN CONSOLIDATION OF NUMBER 20 HIGHWAY AND NUMBER 531 HIGHWAY, EACH 300 METERS IN LENGTH.
»CONTROL TOWER BEN GRUION AIRPORT
TEL-AVIV 2013 - 2013
WATCH-TOWER IN TEL AVIV BEN GRUION AIRPORT,100MT IN HEIGHT
»DORAD POWER STATION
ASHKELON 2012 - 2013
PRIVATE POWER PLANT CONSTRUCTION IN ASHELON,BUILT FOR DORAD ENERGY
»INTERSECTION BRIDGE 4/20
JERUSALEM 2012 - 2013
2 BRIDGE CONSTRUCTION IN JERUSALEM,EACH BRIDGE IS 210 M IN HEIGHT.
»POWER STATION ESHKOL
ESHKOL 2009 - 2010
BASIC STRUCTURE FOR POWER PLANT CONSTRUCTION MADE FOR ISRAEL ELECTRIC COMPANY (CONCRETE WORK).
»POWER CENTER RAMAT HOVAV
RAMAT HOVAV 2009 - 2010
9TH UNIT CONSTRUCTION MADE FOR İSRAEL ELECTRIC COMPANY (CONSTRUCTION OF A GAS TURBIN)
»POWER CENTER RAMLA
RAMLA EAST TEL-AVIV 2006 - 2007
CONCRETE WORKS MANUFACTURING FOR THE INDUSTRIAL POWER PLANT THAT CONVERTS STEAM ENERGY INTO ELECTRICAL ENERGY
»WATER FILTRATION CENTER NETOFA VALLEY
TIBERIYA 2004 - 2006
WATER FILTRATION AND RESPITE FACILITY IN ISRAEL, 15000M3 AND CONCRETE MANUFACTURED
»MODEIN - TEL-AVIV RAILWAY
MODEIN 2002 - 2005
RAILWAY VIADUCT, 410M LENGTH OF THE RAILWAY VIADUCT MADE WITH LUNCHING METHODS
»AİRPORT RAİLWAY
TEL-AVİV AİRPORT 2003 - 2004
RAIL-ROAD BRIDGE BUILT WITH LUNCHING AND PRECAST COMPOSIT METHOD, BUILT IN THE ENTRANCE OF THE AIRPORT,650M HEIGHT IN TOTAL
»