SHAPIR HAIFA PORT

HAIFA

HAIFA PORT PROJECT IN THE CITY OF HAIFA, WITH A PIER LENGHT OF 2 KM AND A WAVE BREAKER LENGHT OF 800MT

»

SHAPIR WAREHOUSE

JERUSALEM 2021

CONSTRUCTION PROJECT OF RAIL SYSTEMS MAINTENANCE, REPAIR, AND STORAGE ON THE AREA OF 24.000 M2

»

TUNNEL 531

RANANA 2014 - 2015

TUNNEL CONSTRUCTION BUILT IN 531 HIGHWAY, BUILT WITH METOD OF CUT&COVER, 200 METERS IN LENGTH.

»

INTERSECTION BRIDGE 531

KFAR SHEMARYAHU 2014 - 2016

CONSTRUCTION OF TUNNEL CROSSING BUILT IN CONSOLIDATION OF NUMBER 20 HIGHWAY AND NUMBER 531 HIGHWAY, EACH 300 METERS IN LENGTH.

»

OROT RABIN POWER CENTER

HEDERA 2014 - 2015

COOLING TOWER CONSTRUCTION CONCREATE WORK.

»

IEC ASHKELON

ASHKELON 2014 - 2014

POWER SANTRAL CHIMNEY 200MT

»

CONTROL TOWER BEN GRUION AIRPORT

TEL-AVIV 2013 - 2013

WATCH-TOWER IN TEL AVIV BEN GRUION AIRPORT,100MT IN HEIGHT

»

THE MAIN TRAIN STATION

JERUSALEM 2012 - 2013

TRAIN STATION IN JERUSALEM 80MT DEPTH

»

DORAD POWER STATION

ASHKELON 2012 - 2013

PRIVATE POWER PLANT CONSTRUCTION IN ASHELON,BUILT FOR DORAD ENERGY

»

INTERSECTION BRIDGE 4/20

JERUSALEM 2012 - 2013

2 BRIDGE CONSTRUCTION IN JERUSALEM,EACH BRIDGE IS 210 M IN HEIGHT.

»

PAZ REFINERY

ASHDOD 2012 - 2013

REFINERY CONSTRUCTION (CONCRETE WORK)

»

POWER STATION ESHKOL

ESHKOL 2009 - 2010

BASIC STRUCTURE FOR POWER PLANT CONSTRUCTION MADE FOR ISRAEL ELECTRIC COMPANY (CONCRETE WORK).

»

POWER CENTER RAMAT HOVAV

RAMAT HOVAV 2009 - 2010

9TH UNIT CONSTRUCTION MADE FOR İSRAEL ELECTRIC COMPANY (CONSTRUCTION OF A GAS TURBIN)

»

MODEIN BRIDGE

MODEIN 2008 - 2009

CONSTRUCTION OF 3 BRIDGES

»

HOLON BRIDGE

HOLON 2007 - 2008

BRIDGE PROJECT ON THE ROAD THAT CONNECTS HOLON AND RISHON

»

AMIKAM BRIDGE

HAIFA 2007 - 2009

270 METERS LONG BRIDGE PROJECT IN HAIDA AMIKAM VALLEY

»

POWER CENTER RAMLA

RAMLA EAST TEL-AVIV 2006 - 2007

CONCRETE WORKS MANUFACTURING FOR THE INDUSTRIAL POWER PLANT THAT CONVERTS STEAM ENERGY INTO ELECTRICAL ENERGY

»

WATER FILTRATION CENTER NETOFA VALLEY

TIBERIYA 2004 - 2006

WATER FILTRATION AND RESPITE FACILITY IN ISRAEL, 15000M3 AND CONCRETE MANUFACTURED

»

MODEIN - TEL-AVIV RAILWAY

MODEIN 2002 - 2005

RAILWAY VIADUCT, 410M LENGTH OF THE RAILWAY VIADUCT MADE WITH LUNCHING METHODS

»

AİRPORT RAİLWAY

TEL-AVİV AİRPORT 2003 - 2004